Year Project 2018 CCP MCG#5 Turbine、Generator and Condenser Installation 2018 TPRI Tongxiao Power Plant 2-3 Gas Turbine Dismantle 2018 EGAT No.4 Dock Hanger Installation 2018 TAMECO Hanger Doors Installation 2018 Sun Ba Power GTG-12 Inner Frame Renew and Transport 2017 Star Energy GTG-12 Inner Frame Renew and Transport 2017 Hai Hu EVER Power Generator-21 Replace 2016 TPC Tongxiao Power Plant Combined Cycle Unit 1、2、3 ST/STG,GT/GTG Condenser Installation 2015 Long Chen Paper Er Lin PM7 Paper Mill Installation 2015 TPC Talin Power Plant #2 STG Erecting 2015 TPC Tongxiao Power Plant Unit 4 Combined Cycle Unit STG Renew 2014 TPC Talin Power Plant #1 STG Installation 2014 CCIP Star Energy GTG Renew 2014 BEC Linkou Power Plant Liner Cans Material Supply and Manufacturing / Installation 2013 FPCC Unit 3 HG2 Generator Renew 2013~2019 TPC Linkou Power Plant Unit 1~3 Boiler Installation 2013~2015 TPC Linkou Power Plant Unit 1&2 Condenser and Heater Installation 2012~2015 TPC Linkou Power Plant Unit 1&2 HP,HIP,ST/STG Installation 2011 Cheng Loong G3 STISTG Installation 2010 Cheng Loong 10M/C Paper Mill Installation 2009 BEC Panay Stack Liners 2009~2010 GPPC DA SHE Turbine and Generator Installation 2009 BEC Toledo Stack Liners Fabrication 2008 DRAGON STEEL Steam Turbine and Generator Installation 2007~2011 Long Men Nuclear Power Plant Unit 1&2 Condenser Installation 2006~2008 CPC Tao Yuan R-101 Dismantle and Renew 2006~2009 Da Tan Power Plant Unit 3/4/5/6 Condenser Installation 2006~2008 Da Tan Power Plant Unit 3/4/5/6 Steam Turbine and Generator Lifting 2006 Da Tan Power Plant Unit 3/4/5/6Stack and HRSG Boiler Modules Lifting 2006 CPC No.26 Generator Lifting 2005~2006 Da Tan Power Plant Unit 1&2 Condenser Installation 2004~2006 Da Tan Power Plant HRSG Boiler and Stack Installation 2004~2005 Da Tan Power Plant GTG、STG、BSGT Installation 2003~2007 Long Men Nuclear Power Plant Unit 1&2 Condenser Fabrication 2002~2003 NAN BU Power Plant HRSG Boiler Module Lifting 2001 Hsin Tao Power Plant Steam Turbine and Steam Generator Installation 2000~2003 Ho-Ping Power Plant Condenser Construction、Steam Turbine Lifting 2000~2001 CPC Zuoying Unit 23&24 Condenser Construction 1999 VEDAN Vietnam Steam Turbine and Generator Lifting and Adjustment 1998~1999 Tongxiao Power Plant HRSG Boiler Module Lifting 1998~1999 REN WU Incinerator Stack、ACC、T/G Fabrication and Installation 1998~1999 NAN QU Incinerator Stack、ACC、T/G Fabrication and Installation 1997~1999 FPG Mailiao Condenser Unit 2&3 Construction 1996~1998 XIN DA Power Plant HRSG Boiler Module Lifting 1996 CLC No.7 Paper Machine Installation and Piping 1995 CAPC No.5 Tower、Tank and Piping 1994 NAN BU Power Plant HRSG Boiler Module Lifting 1992 CPC Naphtha Cracker Section V Cracking Furnace Piping 1990 CLC No.9 Paper Mill Piping Installation 1989~1991 CAPP No.3&4 Silo Tower and Piping 1987 CLC No,1&2 Paper Mill Piping Installation 1986 CSC Construction of Steel Structure and Equipment Installation 1985 CLC No.8 Paper Mill Piping Installation 1984 CAPC No.2 Chemical Plant Tower 、Tank and Piping Installation 1983 CSC LPG Tank Installation 1981 CPC No.1 RDS Piping 1979 CPC Naphtha Cracker Section IV Cracking Furnace Construction