Home
About us
History
Expertise
Lifting Engineering
Installation engineering
Piping engineering
Manufacture
CASES
Power plant
Paper factory
Petroleum rifinery
Steel refinery
Chemical plant
Incinerator
Push-up system
Bar Jack
STRAND JACK
TIMELAPSE
Contact Us
LANGUAGE
繁體中文 Traditional Chinese
簡體中文 Simplified Chinese
Home
About us
History
Expertise
Lifting Engineering
Installation engineering
Piping engineering
Manufacture
CASES
Power plant
Paper factory
Petroleum rifinery
Steel refinery
Chemical plant
Incinerator
Push-up system
Bar Jack
STRAND JACK
TIMELAPSE
Contact Us
LANGUAGE
繁體中文 Traditional Chinese
簡體中文 Simplified Chinese
2016 TPC Tongxiao Power Plant Combined Cycle Unit 1/2/3 ST/STG,GT/GTG Condenser Installation.
2015 TPC Talin Power Plant #2 STG Erecting
2014 TPC Talin Power Plant #1 STG Installation
2014 Star Energy GTG Renew
2014 Linkou Power Plant Unit 1&2 Condenser and Heater Installation
2013 TPC Linkou Power Plant Unit 1&2 Condenser and Heater Installation
2012~2015 TPC Linkou Power Plant Unit 1&2 HP,HIP,ST/STG Installation
2007~2011 Lungmen Nuclear Power Plant Condenser #1,2 Installation
2006~2009 CTCI DA-TAN Power Plant Unit 3,4,5,6 S/T Generator Installation
2006~2009 CTCI DA-TAN Power Plant 3,4,5,6 Condenser Installation
2006~2008 CTCI DA-TAN Power Plant Generator Lifting
2006 CTCI HRSG Unit 3,4,5,6 Stack and Boiler Modules Installation
2005~2006 CTCI DA-TAN Power Plant Unit 1,2 Condenser Installation
2004~2006 CTCI DA-TAN Power Plant Construction of HRSG Boiler and Stack
2004~2005 CTCI DA-TAN Power Plant Unit 1,2 GTG,STG,BSGT Lifting
2003 Lifting and adjustment of turbine and steam generator is work at Changhua Coastal Industrial Park in Taiwan.
2003~2007 Long-Men Nuclear Power #4 Power Plant Unit 1,2 Fabrication of Condenser
2002~2004 Fong Der Power Plant Turbine and Steam Generator Lifting
2002~2003 Nan Bu Power Plant #4 HRSG Boiler Module Lifting
2001 Xin Tao Power Plant S/T and S/G Lifting
2001~2002 He Ping Power Plant S/T and S/G Lifting
2000~2003 He Ping Power Plant Condenser Installation
1999 VEDEN Vietnam S/T and Generator Lifting
1998~1999 Tong Xiao Power Plant HRSG Boiler Module Lifting
1997~1999 Formosa Plastics Mai Liao Unit 2&3 Condenser Installation
1996~1998 Xin Da Power Plant HRSG Boiler Module Lifting
1994 Nan Bu Power Plant HRSG #1,2,3 Boiler Module Lifting